Everything starts with an idea born in 2015 at the Malcolm McKeon Yacht Design studio (MMYD). The long process started at Green Marine Shipyard, Hythe, UK, including a proof of the model in the water.
First half being infused
Applying laminate to topside tooling
Hull bottom outer skin
A taste of the model in the water
The heart-stopping moment of the turning of the boat
2016 - Holland - ZWARTSLUIS
Electrical cables will soon be ordered
The boat arrives in Holland waters. Another year of hard work starts.
Unveiled in white, ready to be transported to Holland
The curve of an unsusual stern
The interiors come together
Work is on all fronts
2017 - towards the happy moment of the launch
The boat leaves the shipyard, destination Zandaam to touch the water for the first time.
The boat leaves Vitters Shipyard and goes to Zaandam